Whole-Home Remodel Timeline: What to Expect Week by Week
A whole-home remodel is a series of connected projects. Knowing the phases helps you plan where to live, when to make selections and how long it really takes.

Example design inspiration, not a completed Northvale project.
How every Northvale project works
- 01Discovery & Consultation
- 02Design & Scope Development
- 03Construction
- 04Punch-List & Walkthrough
Every estimate is free, written and itemized, with labor, materials, allowances, permits and schedule listed separately and license and insurance documentation included.
Why timing matters
Most Alpharetta homes were built between 1980 and 2009. U.S. Census Bureau survey data shows about 76 percent of the city's homes date from those three decades. Many are now due for kitchens, baths, flooring and systems at the same time, which is why whole-home projects are common.
| Decade built | Share of homes |
|---|---|
| 1980-1989 | 22.0% |
| 1990-1999 | 34.6% |
| 2000-2009 | 19.6% |
| 2010-2019 | 13.5% |
| 2020 or later | 2.6% |
| Before 1980 | 7.8% |
Source: U.S. Census Bureau, American Community Survey 2019-2023 5-year estimates (via Point2Homes).
Typical phases
| Phase | What happens | Your role |
|---|---|---|
| Discovery and consultation | Walkthrough, goals, budget range | Share priorities and must-haves |
| Design and scope | Drawings, selections, line-item estimate | Make selections on schedule |
| Permits and ordering | City review, long-lead materials ordered | Approve final scope |
| Demolition and rough-in | Removal, framing, plumbing, electrical, HVAC | Plan living arrangements |
| Inspections | City inspections before walls close | Keep access clear |
| Finishes | Drywall, flooring, cabinets, tile, trim, paint | Review progress |
| Punch list and walkthrough | Final details and inspections | Walk the house and list items |
Northvale process.
What makes timelines slip
- Late selections. Decide before the trades need them.
- Long-lead items like custom cabinets, windows or specialty tile.
- Hidden conditions found during demolition.
- Permit review times and inspection scheduling.
- Change orders after work has started.
Planning several projects at once? Get a phased estimate.
Cost reference
Block Renovation publishes whole-home renovation costs in a range of roughly $167 to $218 per square foot for the areas renovated. Your cost depends on how much of the house is included and the finish level.
Living at home during the work
Some families stay home while work moves room by room. Others move out during the heaviest phases, especially when the kitchen and main bathrooms are torn out at the same time. We help you plan phasing so the house stays livable when possible.
How to prepare
- Set a realistic budget with a contingency for older-home surprises.
- Make a list of must-haves and nice-to-haves.
- Plan storage for furniture and belongings.
- Decide early how you will cook and bathe during the work.
Selections calendar
Late selections are the most common reason whole-home projects slip. Making decisions in the right order keeps trades moving.
| Selection | Finalize by |
|---|---|
| Layout and structural changes | Before permits are submitted |
| Windows and exterior doors | Before permits or ordering |
| Cabinets | Before demolition, due to lead times |
| Plumbing fixtures | Before rough plumbing |
| Electrical and lighting plan | Before rough electrical |
| Tile and flooring | Before drywall is finished |
| Paint colors and hardware | During finishes |
Northvale process.
Phasing options
- All at once: shortest total time, but the house may be unlivable for part of it.
- Floor by floor: keeps one level usable.
- Room by room: longest total time, most livable.
Budget planning
Whole-home projects carry more unknowns than single rooms because more walls and floors are opened. Building a contingency into the budget protects the project from stalling when older wiring, plumbing or framing needs attention. A line-item estimate makes it easier to decide where to adjust if surprises appear.
Communication
Large projects go better with a single point of contact, regular written updates and a shared selections list. Ask how your contractor handles change orders and schedule updates before you start.
Signs your home is ready for a whole-home remodel
- Kitchen, baths and flooring all date from the original build.
- The layout no longer fits how your household lives.
- Systems such as the electrical panel or water heater are near the end of their life.
- You plan to stay long enough to enjoy the result.
Key takeaways
- About 76 percent of Alpharetta homes were built from 1980 to 2009, so many need several updates at once.
- Doing several projects together reduces repeated demolition, permits and trade visits.
- Late selections are the top cause of delays.
- Phasing decides whether you can live at home during the work.
- A contingency protects the schedule when older-home surprises appear.
Frequently asked questions
How long does a whole-home remodel take? It depends on scope. Single-level updates are faster than projects that include kitchens, multiple baths, flooring and structural changes.
Should I update systems at the same time? If the walls are open anyway, updating wiring, plumbing or ductwork is often efficient.
A realistic sequence for a 1990s Alpharetta home
A typical example: a two-story home built in the 1990s with an original kitchen, garden-tub primary bath, carpeted main level and a closed formal dining room. The plan might combine a new kitchen with an island, opening the dining room wall, continuous hardwood across the main level, and a primary bath with a larger shower. Design and selections come first, then permits, then demolition of the kitchen and dining wall, rough-ins and inspections, then flooring, cabinets, tile and trim, and finally the punch list. Doing the primary bath upstairs in the same window keeps trades on site efficiently.
Every home is different, so your written schedule will reflect your scope, selections and permit timing.
What really sets your schedule: lead times
Most homeowners assume the schedule depends on how fast the crew works. In practice it often depends on how long materials take to arrive. Published 2026 guides agree that cabinets are usually the longest wait, followed by windows, with countertops following cabinets by design. The ranges below are industry-published figures from suppliers and builders, not promises from any particular manufacturer, and they vary by product line and season.
| Item | Published lead time | Notes |
|---|---|---|
| Stock cabinets | 1 to 3 weeks | Often in stock, so the fastest option |
| Semi-custom cabinets | 6 to 10 weeks | The most common middle choice |
| Fully custom cabinets | 10 to 16 weeks | Built to order, so ordering early matters most |
| Quartz countertops | 2 to 3 weeks after template | The template happens after cabinets are installed |
| Windows | 4 to 12 weeks | Standard sizes sit at the short end, custom at the long end |
How one late order cascades
Remodeling steps depend on each other. Countertops cannot be templated until the cabinets are installed, and the countertop fabrication time starts only after that. As a simple illustration using the ranges above, a semi-custom kitchen needs 6 to 10 weeks for cabinets, then installation, then a 2 to 3 week wait for quartz. Adding those lead times alone gives 8 to 13 weeks before the countertops are in, and that excludes installation time and any permit wait. If the cabinet order slips by two weeks, the counters, the plumbing hookup and the backsplash all slip with it.
Published kitchen timelines, start to finish
One 2026 timeline guide puts a typical kitchen remodel at 6 to 12 weeks from demolition to final walkthrough, with another 4 to 8 weeks of planning before any work begins, for a total of roughly 3 to 5 months. It breaks the work into types, which is a useful way to set expectations.
| Type of project | Active work | Includes |
|---|---|---|
| Light cosmetic refresh | 2 to 4 weeks | Paint, hardware, maybe new countertops |
| Pull-and-replace remodel | 6 to 10 weeks | Same layout, new cabinets, counters, appliances and flooring |
| Typical kitchen overall | 6 to 12 weeks, plus 4 to 8 weeks of planning | Roughly 3 to 5 months in total |
A whole-home project stacks several of these at once, which is why the phases in the guide above overlap and why ordering early is the best schedule insurance you have.
What scope changes do to the timeline
Changes made after work starts are the other big schedule risk. One contractor guide estimates that mid-project changes can add 10% to 15% to cost and lengthen the timeline by about 30%. Applied to an 8-week project, a 30% stretch gives about 10.4 weeks, or more than two extra weeks of living with the disruption. The practical lesson is to finish selections before demolition and to treat every change as something that needs a written price and a stated schedule effect, as the FTC advises for change orders.
Permits and plan review take time too
Permit review happens before work begins and is easy to underestimate. Published summaries of the City of Alpharetta’s process describe first-round comments in about ten business days, and the FTC advises that a contract state estimated start and completion dates and the contractor’s obligation to get permits. Our permits guide explains what to expect. A realistic schedule starts the clock when the permit is approved, not when the contract is signed.
A schedule checklist
- Order long-lead items first: cabinets, windows and special-order tile before demolition starts.
- Get delivery dates in writing: and ask what happens to the schedule if they slip.
- Ask when the countertop template will happen: it follows cabinet installation, so plan the gap.
- Settle selections early: late changes are the most common cause of avoidable delay.
- Plan for storage and temporary living: one contractor guide lists storage units at $50 to $250 per month.
- Keep a time reserve: as with money, a buffer in the schedule keeps one slip from becoming a crisis.
Quick answers on remodel schedules
Why does my contractor ask for selections so early?
Because long-lead items such as cabinets and windows set the critical path. Ordering them before demolition can save weeks, and changing them after ordering often adds more.
Can the schedule be shortened?
Often, by choosing stock or semi-custom cabinets over fully custom, by finishing selections early and by ordering before the permit is approved where the contract allows. Ask your remodeler which of these fit your project.
What should the contract say about timing?
The FTC advises an estimated start and completion date, and the payment schedule should follow completed work, so a late finish is reflected in what you owe.
Every Northvale estimate is free and itemized, with labor, materials, permits and schedule listed separately so you can compare bids line by line. Call (470) 847-9076 to book a free in-home estimate.
Sources and notes
Lead times and kitchen timelines are published industry ranges checked in November 2026 and vary by manufacturer, season and product line. The 8 to 13 week figure is simple addition of published ranges, not a forecast. Scope-change figures come from a contractor guide and are estimates.
Sources: Quik Cabinets, kitchen remodel timeline 2026; BuilderMuse, build timelines and window lead times, 2026; Phoenix Home Remodeling, hidden costs and scope changes; FTC, Hiring a Contractor.
Related guides
Get a whole-home plan with a written schedule. Call (470) 847-9076.
Serving Alpharetta, Milton, Roswell, Johns Creek, Peachtree Corners, Sandy Springs, Georgia.
Key takeaways on whole home remodel timeline
If you are researching whole home remodel timeline, start with the figures and sources on this page, then compare them with a written, line-item estimate for your own home.
Every question we hear about whole home remodel timeline comes back to scope, materials and schedule, which is why our free in-home estimate lists labor, materials, allowances and permits separately.
Prices, timelines and permit rules change, so treat anything you read about whole home remodel timeline as a starting point and confirm the details with the permit office that governs your address.
For help with whole home remodel timeline, call (470) 847-9076 or use the contact page to book a free in-home estimate with licensed, insured Northvale crews.
Bookmark this page on whole home remodel timeline and check the linked sources before you make a decision.
Our other guides link back to whole home remodel timeline, so you can move between topics without repeating your research.